More references for Smoke and heat ventilation:

Fraport

Essential Information

Place / country:Frankfurt, Germany
Year:
Building type:Airport building
Solutions:SHEV systems
Lift shaft smoke extraction
Fresh air flap
CI Control LSE
Building automation
Efficiency:

32% energy saving

Uw=2.1 W/(m²K) vs. Uw=3.1 W/(m²K) as per German Energy Performance of Buildings Directive 2009

Comprehensive system for smoke extraction and day-to-day ventilation for newly installed lifts in compliance with the Energy Performance of Buildings Directive. The entire system technology is VdS-certified and complies with special airport requirements. The facade windows can be activated as a source of fresh air in the event of smoke and heat ventilation.

  • Supply and installation of smoke and heat exhaust systems for stairways
  • Cabling and malfunction feedback signal to the building control system
  • Supply of facade flaps which can be operated using the three drives supplied by the client
  • Activation of the facade flaps with three SHEV system control panels