Safety in all renovation phases ...

Analysis – the meeting on site

  • The details of the renovation process are recorded in a checklist. 
  • Together with the customer, the functional and energy requirements for the new systems are defined. 
  • Clarification of interfaces.

 

 

Establishing the basics – We find answers to the important questions:

  • What state is the old material in? 
  • Can the substructure still be used? 
  • Is complete removal of the old structures and complete rebuilding necessary?

 

 

 

Preliminary planning and design engineering – What we offer you:

  • A large product range in terms of energy efficiency and desired functions.
  • Custom, building-specific adaptation of the daylight systems. 
  • Highly transparent presentation of costs in a detailed, system-depicting quotation. 
  • Renovation solution according to your vision and your view of economic efficiency.

 

 

 

 

Approval planning – Your daylight system takes shape:

  • We design and plan the daylight system in detail. 
  • We create a binding approval drawing. 
  • You receive supporting documents about the energy qualities of the daylight systems. 
  • We provide you with assistance with any relevant questions in the approval phase.

 

 

Implementation planning – Production begins:

  • Creating the production plans. 
  • Master planning / production. 
  • Monitoring the production process. 
  • Quality control.

 

 

 

 

Installation – Planning and implementation:

  • Creating the production plans. 
  • Master planning / production. 
  • Monitoring the production process. 
  • Quality control.

 

 

From surveys to documentation:

  • Trained specialists for implementing all installation and maintenance work. 
  • Surveying of the condition of the SHEV systems. 
  • Promises of delivery from all well-known SHEV installer companies covering original spare parts for maintenance. 
  • VdS and ISO 9000 certification. 
  • Administration of a detailed test book as per DIN 18232-2 as part of the maintenance agreement.